News Blockchain and technology
Citrea prepares Pomelo upgrade: SP1 migration today, node updates by Wednesday
Citrea’s Pomelo upgrade is scheduled to begin on 23 November at 17:00 Israel time. It moves the proving system to Succinct’s SP1, but Monday’s start is not the end of the process: full node operators have a separate update deadline of 25 November.
Checked on 23 November 2026.
Two stages behind one start time
Citrea, an application layer that uses Bitcoin for data publication and settlement, is preparing to replace its proving infrastructure today. Its official Pomelo announcement (Opens in a new tab) schedules the start for 15:00 UTC, or 17:00 in Israel on Monday, 23 November 2026. That window had not begun when this article was prepared. This is not confirmation that the upgrade has been completed.
The original announcement appeared on 20 November. Crypto news reports this morning, including ChainCatcher, described a project reminder ahead of the work. The official plan distinguishes Monday’s prover migration from Wednesday’s layer-two fork activation. Full node operators are instructed to update after the binaries are released, within the window ending on 25 November.
That distinction matters in practice. Infrastructure operators need to follow the release instructions, rather than assume their work is finished when the starting hour passes. Application users need to check the availability of the service they use. These are separate checks attached to the same change.
What a proving system replaces
The migration covers proofs for both the rollup and the Clementine bridge. A proving system lets someone check a claim about a computation through cryptographic evidence. That is a different task from an application accepting a payment or a service crediting a customer’s account.
Citrea describes two layers: batch proofs check changes to the layer-two state, while light-client proofs aggregate proofs and check Bitcoin consensus rules. SP1 is Succinct’s environment for generating proofs and supports Rust programs. Citrea’s connection to Bitcoin does not turn every change in Citrea software into a change to Bitcoin’s own protocol.
For readers separating a recorded fact from a service’s promise, our blockchain guide covers the foundations. Even when a proof can be checked, it remains important to understand exactly what it proves and which components operate outside it.
A maintenance window is not a deadline for every transfer
The project warns of a few minutes of unavailability during several hours of maintenance. The opening of its announcement specifies a three-hour window, while the closing section describes three to four hours for the migration. The publication therefore should not be read as a precise finishing time or a guarantee for an individual user action.
The bridge is also distinct from the application network. Citrea says Clementine may take longer to finish updating, depending on how quickly its distributed signer set upgrades. The announcement describes Clementine as handling transfers of 10 BTC or multiples of that amount. The project expects ordinary mainnet activity to remain unaffected while the bridge finishes; that is the operator’s expectation, not our own measurement.
The next evidence to look for is an official completion announcement and links to the released versions. Citrea has promised these after the work, alongside details of the integration and fixes. Until then, a planned schedule is not evidence of completion. The announcement provides no basis for promising returns, zero risk or a change in any asset’s price.